Fraud Blocker
Skip to content
SQM Architects

SQM Architects

  • Home
  • About
  • ServicesExpand
    • Pre-purchase Feasibility Study
    • Architectural Design Services
    • Contract Administration Services
    • Project Management Services
  • ProjectsExpand
    • Duplex Dual Occupancy
    • 3-Townhouses Development
    • 2-Townhouses Dual Occupancy
    • House Extension
  • Blog
  • Contact
(03) 9005 6588
Facebook Linkedin Email Instagram Twitter
Phone
SQM Architects
SQM Architects

Front-And-Back 3 Townhouses Development (Ferntree Gully)

Home > Feautured Projects > Front-And-Back 3 Townhouses Development (Ferntree Gully)

At a glance

The site is 843m2 in size, located at Ferntree Gully. There are many dual occupancies and 3 townhouses development precedence in the area. The site is directly opposite a commercial retail plus warehouse; therefore, feasibility study was performed for various development forms including commercial development, detached 3 beds plus townhouses, attached 4 beds plus townhouses and attached 3 townhouses.

After review of financial and construction cost the owner who is also a builder decided to go with the 3 townhouses development to fit an extra tenancy on small block usually suitable for dual occupancy if subdivided.

side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
Free Initial Consultation

Key results

3 Townhouses on a Small Block

The early communication with council paid off. The proposed development received support from council and neighbours without VCAT.

Money and Energy Saving

The increased site fall created a self-sustained stormwater system that avoided the use of a stormwater pump, save money and energy for a long run.

Optimum Solar Gain

Optimum solar gain from North facing windows and fully openable glazed doors to the backyard.

Large Open Plan Living

Large open plan living allows for flexible furnishing arrangement.

Maximised Building Footprint

Maximised the buildable building footprint. Minimum internal circulation space wastage. Additional bathroom on ground floor in lieu of a basic powder room.

Constraints

  • Small land size for 3 townhouse
  • Fronted with a large street tree & speed bump
  • Large swimming pool in the rear to be infilled
  • Old driveway on the north side, unable to move to South due to too close to speed bump
  • Large native tree in the rear (need to be retained)
  • 2.4m rear Easement
  • Recently rezoned as Residential zone 3
  • No precedence in the area for 3 double storey townhouses. (Only single storey at rear)
  • Council ROW fence not on title boundary and collapsed into our site.
  • Underground drainage information not aligned with the drainage record.Within flood zone, high flood level.
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)

Opportunities

01

Adjacent to Commercial Zone

It can be a constraint but also an opportunity for us to explore smaller housing options. As next to commercial zone means the targeted residents might be shifted from large families to small and younger families and on site parking demand is less as so close to works and shops in the commercial zone.

02

No Neighbour on the North Side

No over shadowing and overlooking issue on the North, only a council Right of Way (ROW); able to design large windows and courtyards on the North with maximum solar gain and a glimpse of city skyline view.

side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)

Key focus

The client is a builder developer, it will maximise his investment’s profitability if more units can be fit on the land as the cost for a 4-bed dual occupancy townhouse is almost the same as a 2-3 beds 3 townhouse development; but 3 townhouses’s market value is much higher.

Solutions

  • Early feasibility study & market research to determine the right development type.
  • Obtain pre application approval from council for introducing a higher density design prior to submitting the application.
  • Reposition crossover for a southern driveway, use landscaping and mailbox position to disguise the large curved driveway.
  • Minimize front and rear setback for larger built area.
  • 2 beds townhouse with single garage for the additional residency.
  • Simple large open plan design
  • Additional bathroom on ground floor in lieu of a basic powder room.
  • Seperate bath and amenity areas to service the individual urban lifestyle.
  • Position living areas and habitable rooms on the North for optimal solar gain and city view.
  • Negotiate drainage exemption for unexpected drainage found close to the proposed footing.
  • Independent arborist report and pre-construction inground services survey to gain support from council for the development.FFL raised 500mm by council civil engineer, modification to site fall, engineered slab design and combine retaining wall with kerbs and channels to achieve a sustainable stormwater system.
our services
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
Front-And-Back 3 Townhouses Development (Ferntree Gully) 17
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)
side by side dulay occupancy - Front-And-Back 3 Townhouses Development (Ferntree Gully)

Are you looking for project development partner for the modern construction age.

Our team is made up of qualified and experienced individuals with the skills and knowledge to identify opportunities and deliver the right advice.

Free Initial Consultation
SQM Architects, based in Melbourne, are industry-leading architects with over 15 years of experience in delivering exceptional building design solutions.

Quick Links

  • About
  • Services
    • Pre-purchase Feasibility Study
    • Architectural Design Services
    • Contract Administration Services
    • Project Management Services
  • Feautured Projects
    • Side-by-side Duplex Dual Occupancy (Doncaster)
    • Front-And-Back 3 Townhouses Development (Ferntree Gully)
    • Front-And-Back 2-Townhouses DUal Occupancy (Blackburn South)
    • Dual Occupancy By Rear House Extension (Rowville)
  • Contact

Navigation

  • Pre-purchase Feasibility Study
  • Architectural Design Services
  • Contract Administration Services
  • Project Management Services

Recent Posts

  • Common Mistakes in Victoria Land Subdivision: How to Avoid Costly Errors July 25, 2024
Search

Privacy Policy | Terms & Conditions

© 2025 SQM Architects

ABN 32 600 928 390 | ARBV Registration 51498

FREE ReSOURCE

Just enter your details in the form below and we’ll send you the resource for free.

Scroll to top
  • Home
  • About
  • Services
    • Pre-purchase Feasibility Study
    • Architectural Design Services
    • Contract Administration Services
    • Project Management Services
  • Projects
    • Duplex Dual Occupancy
    • 3-Townhouses Development
    • 2-Townhouses Dual Occupancy
    • House Extension
  • Blog
  • Contact

Call Us: (03) 9005 6588
Email Us: [email protected]